Peak history
We worked with the available load curves from the last three years, identifying peaks and their distribution over time.

A growing food business: connecting consumption, solar PV and new requirements before choosing the future configuration.
The business had three 200 kW meters and three PV systems. A proposed new building, with a power requirement to be assessed at around 400 kW, made it necessary to understand how the loads were actually distributed.
We worked with the available load curves from the last three years, identifying peaks and their distribution over time.
We compared supply points over matching intervals to reconstruct the virtual combined peak.
We related consumption to the contribution of solar PV and the expansion scenarios.
The analysis revealed anomalies in measurement coefficients. We explained the historical data’s limitations and the possibility of an accurate reconstruction from March 2026. Data quality was included in the report alongside the charts, allowing comparisons to be given the right weight.
Keep the meters separate or consolidate them? How should the new building be integrated? What could an additional PV system, envisaged at 300 kWp, contribute? Is storage worth investigating? We organised curves and charts to make these choices clear to management.
Peak analysis and charts showing their distribution, the PV contribution and virtual simultaneous demand. Expansion and storage remain scenarios to assess; the processed data provide the basis for technical and economic comparison.
Share your goals and available data: together we will identify a useful first step.