Aosta Valley: energy efficiency for industry and crafts
Investments from €150,000 to €2 million; up to 60% under de minimis, within applicable limits.
Deadline:
The scheduled deadline has passed. This news item remains in the archive; consult the source for any extensions.
Industrial and craft businesses with an eligible ATECO code and an existing production site in the Valley. Deadline extended to 31 December 2026, as communicated by the Region in measure no. 811 of 23/09/2026. Check the availability of funds.
What is needed to take part
- Energy audit signed by a qualified professional, prepared in the six months before the application.
- STEP technical form, quotations, financial plan and proof of availability of the site; further attachments depending on the measure.
- Minimum savings: 20% for buildings, 5% for processes. Apply through SISPREG; check the rules on starting work before placing orders.
Official sources · deadline extension checked on 11 October 2026: Aosta Valley Region · Call for applications (PDF).
Summary of requirements: consult the full call, annexes and availability of funds before applying. Times shown are Italian local time.
